Project :- Large society rainwater harvesting projects
Location :- Ahmedabad
Total area :- 9 acres
Rainwater Potential :- 1.25 crore litters per year
Layout :- 60% Paved Area, 20% Roof area, 10% garden area, 10% hard surface
Problems :-
- Heavy water logging during rainy days.
- Borewells are drying.
Solution :-
- Installation of Eight injection recharge wells
- Interconnection of all eight recharge wells.
Results :-
- Saving of 1.25 crore litres of rainwater falling in the primes.
- Capturing rainwater by gravity through injection recharge well, filtering through a primary and secondary filter system and diverting in dedicated eight recharge borewells.